Funding expertise

Funding routes, and what it takes to deliver against them.

Most schemes are shaped by the funding behind them: eligibility, spend profile, reporting and deadlines. We work with the funding conditions from the start rather than discovering them halfway through.

Funding routes we deliver under

Warm Homes: Social Housing Fund
Successor to SHDF. Bid-stage archetype sampling, cost plans and delivery programmes, then assessment, design and installation once an allocation is confirmed.
Social Housing Decarbonisation Fund
Wave 1, 2 and 2.1 schemes carried out as principal contractor, including mixed-tenure blocks and non-traditional archetypes requiring remedial work before insulation.
Warm Homes: Local Grant
Single properties referred through local authority schemes. Eligibility checked, assessment carried out, measures installed and certification lodged.
Privately funded work
Landlord portfolios, owner-occupiers and non-domestic buildings, costed and sequenced without a funding deadline dictating the programme.

Where an allocation is already in place

If you have secured funding but need a delivery partner, we can mobilise against the existing programme as principal contractor. We pick up the approved property list, re-check the assessments where they are out of date, and hold the spend profile you committed to.

Where a programme is running behind, we can take on a package of properties alongside an incumbent contractor rather than replacing them, which is usually the quicker way to protect an allocation.

Aerial view of a housing estate part-way through a retrofit programme

What we do at bid stage

Stock analysis
Portfolio data reviewed by archetype, tenure and EPC band, so the properties put forward are the ones that will actually score and can be delivered inside the window.
Archetype sampling
Sample assessments across the representative property types, used to size the measure package and test the assumptions behind the cost plan.
Cost plans
Measure costs built from the sampled archetypes rather than a flat rate per property, including allowances for remedial work on non-traditional construction.
Delivery programme
A programme that matches the spend profile and defrayal dates, with the sequence set by access and scaffold rather than by property number.
Reporting
Monthly reporting against the funding conditions: properties assessed, measures installed, spend, lodgements and carbon savings.

What an allocation looks like on site

A site team going through the installation programme outside housing
Mobilisation and programme
External wall insulation being fitted to a terrace
Fabric measures first
Solar panels being installed on a roof
Generation and low-carbon heat